Skip to main content
Home
Home
  • Status
  • Science
    • Art and Archaeology
    • Biology
    • Chemistry
    • Energy
    • Engineering
    • Materials
    • X-Ray Technology
    • User Stories
    • Science Highlights
    • Publications
  • Users
    • 2025 CHESS User Meeting
    • Workshops at CHESS
    • Beamline Directory
    • X-Ray Run Schedule
    • What's the process? - Prospective User Guide
    • User Guide
    • User Agreement
    • BeamPASS
    • CHESS Deadlines
    • CHESS Status Page
    • Safety
      • In-Person User Orientation and Safety Training
    • Technical Resources
      • Affiliated Resources
      • Calculators
      • Computing
      • Detectors
      • Video Backgrounds
    • Acknowledgments
    • Travel and Lodging
    • Shipping
  • Facilities
    • Becoming a Partner
    • CHEXS
    • HMF Beamline
    • MSN-C
    • MacCHESS
    • XLEAP
      • People of XLEAP
      • XLEAP Overview
      • Proposed Capabilities
      • Stay in touch
  • Public
    • Events
    • Tours
    • Student Opportunities
    • Lending Library
    • 3D and Virtual Tours
  • Industry
  • About
    • Staff Directory
    • Advisory Bodies
    • What we do
    • Job Openings
    • News
      • CHESS eNewsletter
      • Media Resources
      • News Archive
    • Publications
      • Publications 2025
      • Publications 2024
      • Publications 2023
      • Publications 2022
      • Publications 2021
      • Publications 2020
      • Publications 2019
      • Publications 2018
      • Publications 2017
      • Publications 2016
      • Publications 2015
      • Publications 2014
      • Publications 2013
      • Publications 2012
      • Publications 2011
      • Publications 2010
      • Publications 2009
      • Publications 2005
    • Beyond the Lab
    • History

Tours

Can't make it for an in-person tour? Check out our latest virtual tour on Facebook

  • Read more about Tours

50 years Later, Wilson Lab stays cutting edge 

Chris Conolly looks at the concrete floor of Wilson Lab, eyeing up the numerous holes drilled by one of the contractors for the upgrade project. These one-inch holes pockmark the 10,000sf experimental hall of the Wilson Synchrotron Laboratory. In a way, these holes represent the numerous experiments conducted over the past 50 years.

Tags
chess-u
art & archaeology
  • Read more about 50 years Later, Wilson Lab stays cutting edge 

New Hutches Installed as CHESS-U Takes Shape

In early 2019, CHESS-U will have an increased energy of the electron beam, from 5.3 to 6.0 GeV, double the current from 100 to 200 mA, and reduction of the horizontal emittance of the x-ray beam from 100nm to 30nm.

Tags
chess-u
  • Read more about New Hutches Installed as CHESS-U Takes Shape

CHESS-U update, August 2018

The crews are currently working in concert with each other, moving from east to west through the L-0 experimental hall.  When a new magnet assembly goes in, the crews place a new portion of shielding wall, then a new front end assembly, followed by utilities and more portions of shielding wall - creating a dance that requires strict planning while donning steel-toed boots. 

Tags
chess-u
  • Read more about CHESS-U update, August 2018

CHESS-U Week 1

 

 

Tags
chess-u
  • Read more about CHESS-U Week 1

The machinist: A maker finds his calling in upstate New York

CHESS is a high-intensity X-ray source, primarily supported by the National Science Foundation, that provides users with state-of-the-art synchrotron radiation facilities for research in physics, chemistry, biology and environmental and materials sciences.

Tags
chess-u
  • Read more about The machinist: A maker finds his calling in upstate New York

Particle accelerator upgrades keep Cornell competitive

Joel Brock, Director of Cornell High Energy Synchrotron Source—or CHESS—ducks under machinery to get into the tunnel of the particle accelerator.

“This is the tunnel part. Now you can see it’s round. This was bored like a subway tunnel in the early 60s and the view doesn’t change much from here on a round.”

Tags
chess-u
  • Read more about Particle accelerator upgrades keep Cornell competitive

CHESS Transition

This article explains the changes, lays out dates and timelines, and other helpful information for users currently doing research at CHESS and those eager to do so in the future.

Tags
chess-u
  • Read more about CHESS Transition

CHESS-U Magnet Program update

To minimize the shut down (“dark”) time, we are placing all new magnets on girders. Then, when CESR operation is stopped for the upgrade, the girders will be moved to the tunnel and fitted into the storage ring. Each of the twelve girders contains two horizontal focusing quadrupole magnets, one large combined function magnet (bends the beam trajectory and focuses the beam vertically), and four small correcting magnets.

Tags
chess-u
  • Read more about CHESS-U Magnet Program update

CHESS-U accelerator design: From two beams to one

This unit cell was repeated roughly 50 times around the CESR tunnel. A FODO-based accelerator is very flexible and the design allowed for many modes of running over the following decades, up to and including the present-day "arc pretzel" CHESS operations.

Tags
chess-u
  • Read more about CHESS-U accelerator design: From two beams to one

Pagination

  • Page 1
  • Next page ››
Subscribe to chess-u

Footer menu

  • Newsletter
  • CLASSE
  • Contact
  • Staff
  • Feedback
  • Web Accessibility Help
The Cornell High Energy Synchrotron Source (CHESS) is operated and managed by Cornell University.
CHESS/Wilson Lab 161 Synchrotron Drive Ithaca, NY 14853
© 2025 Cornell High Energy Synchrotron Source