Sidebar Menu (View Pages)
- Status
- ⌃ Science
-
⌃
Users
- 2025 CHESS User Meeting
- What's the process? - Prospective User Guide
- User Guide
- User Agreement
- BeamPASS
- Beamline Directory
- CHESS Deadlines
- X-Ray Run Schedule
- CHESS Status Page
- ⌃ Safety
- ⌃ Technical Resources
- Acknowledgment
- Travel and Lodging
- Shipping
- ⌃ Facilities
- ⌃ Public
- Industry
-
⌃
About
- Staff Directory
- Advisory Bodies
- What we do
- Job Openings
- ⌃ News
-
⌃
Publications
- Publications 2025
- Publications 2024
- Publications 2023
- Publications 2022
- Publications 2021
- Publications 2020
- Publications 2019
- Publications 2018
- Publications 2017
- Publications 2016
- Publications 2015
- Publications 2014
- Publications 2013
- Publications 2012
- Publications 2011
- Publications 2010
- Publications 2009
- Publications 2005
- Beyond the Lab
- History
Tags
Featured

CHESS-U hutches take shape
Fabrication of the first two CHESS-U hutches has begun at the Lansing, NY facility of ADC Inc.

CESR CHESS-U activities: Production of magnet assemblies
CHESS-U work on the CESR side is well into the pre-production phase. Most long lead items are on order and production work at Wilson lab is underway for several systems.

The state of CHESS-U beamlines
The beamline upgrade portion of the CHESS-U project is moving ahead at full steam. Scientific needs have been identified. A suitable layout for the experimental floor has been devised.

March 2017 workshop on CHESS-U as a pulsed x-ray source
Our users may be aware that during the summer of 2016, CHESS hosted six workshops to help outline a science case for an upgraded single-beam, high-energy source that will result from the current CHESS-U upgrade project.

Brookhaven generously shares NSLS-II upgrade experience with CHESS-U project technical staff
Nine members of the CHESS technical staff recently visited NSLS-II at Brookhaven National Laboratory on Long Island for a day packed full of tours, presentations, and discussions about what it takes to design, build, commission, and maintain a synchrotron user facility.

CHESS-U project update: New CESR magnet design and first articles delivery
There is an on-going major upgrade program for the Cornell High-Energy Synchrotron Source (CHESS) to boost the photon beam brilliance by an order of magnitude.

With CLEO detector gone, CHESS facility looks back, ahead
Three months ago, without a whole lot of fanfare, an era in particle physics at Cornell came to an end.

Science case for CHESS-U upgrade project released
CHESS Director Joel Brock recently announced the exciting news: “Over the next two years, the CHESS-U project will transform the laboratory. We will do this by optimizing the particle accelerator for x-ray production, and enhancing our x-ray capabilities through unique technology. This upgrade will introduce new scientific possibilities for our users and the synchrotron scientists of tomorrow.”